Lovat is a world leader in the custom design, service, refurbishment/modification and manufacture of a complete line of TBMs, with over 35 machines currently operating in 10 countries.
Lovat specialises in rock (single- and double-shield), soft-ground (EPB and non-pressurised), slurry and mixed-face TBMs, ranging from 0.75m to 15m in diameter. To date, the company has built over 250 TBMs and performed over 150 full refurbishments for more than 700 tunnelling projects. Lovat machines have excavated more than 2,000,000 meters of tunnel worldwide.
Lovat
Tel: +1 416 675 3293
Email: tbm@lovat.com
Web: www.lovat.com
A Lovat TBM in the factory
