Lanesfield Engineering is a leading worldwide supplier of Wire Brush Tailseals, supplying both manufacturers and contractors. Seals can be built to any design to suit any make of TBM. “Available individually or as pre-welded sets, and fitted in one, two, three or four ring systems, Lanesfield tailseals can withstand substantially high water pressures,” says the firm.
With its experience in the construction of these specialist seals, Lanesfield can also offer additional design features to meet customer specific requirements. Reverse flow stop plates can be fitted to the outer row seals, helping to restrict the backflow of grout along the length of the TBM.
Lanesfield Engineering
Tel: +44 1902 497 777
Email: seals@lanesfield.com
Web: www.lanesfield.com
