The 1,394ft (424.8m) tunnel will be turned into an art show on the Saturday morning. Visitors will be able to walk through the road tunnel as part of the installation Voice Tunnel. In the middle there will be an intercom into which they can speak a message that will then be broadcast out in waves of sound and light.