The Colombian government is considering plans to reduce the cost of the Bogotà Metro from $3bn to $2.7bn. Consultants have proposed reducing the concession from 33 to 25 years, reducing construction time for Line 1 from seven to five years, and separating the financing of construction and operation.
Line 1 of the Rio de Janeiro Metro.
