Swiss engineering firm Electrowatt Infra, in joint venture with Basler & Hofmann, recently won a contract to design a 5km long railway tunnel and underground station beneath the existing station in Zurich.
The deal has been placed by Swiss Federal Railways and Zurich municipal government.
More in September’s T&TI
