The City of Hamburg, Germany, is planning a 3.2km long underground extension to its Metro system. Construction will be divided into three sections: firstly a 700m long cut and cover section from Mönckebergstrade to Adolphsplatz; section two involves the boring of 1.4km of twin tube tunnel to Grasbrokk; and lastly 1.1km of cut and cover continuing the line on to Baakenhafen. Construction is scheduled to start in 2006 for the line to be operational by 2011.
