Local press reports said India was planning to set-up its own underground neutrino observatory in Tamil Nadu to study some of the fundamental particles that form the universe.
The facility will be located in a cavern 1km below the surface at Singara, about 100km south of the city of Mysore. The lab aims to conduct experiments involving detection of neutrinos coming through the earth’s atmosphere and determine properties through their energy and measurement of other variables. As with other such facilities, the lab will be situated underground to shield the experiments from cosmic ray particles that would otherwise adversely affect the apparatus.
Plans call for a 120m long x 22m wide x 30m high cavern said Prithviraj Chavan, a Minister of State within the Indian Prime Minister’s Office. It will be developed as part of a detection, research and development facility over the coming ten years said Chavan.
