With a maximum 500-word requirement, abstracts should be in English and presented in either Word (docx.) or PDF formats.
All abstracts and papers will be peer reviewed. The ‘presenting author’ must be prepared to present their paper in person and pay the registration fee.
Organised by the Swedish Rock Engineering Association, the 10th Nordic Grouting Symposium will be held on 4–6 October 2022 in Stockholm, Sweden.
Further details are available at http://www.ngs2022.se