Hot on the heels of the 2004 Olympics closing ceremony in Athens, was the completion of a tunnel in Italy for the 2006 Winter Olympics in Turin. At 11.00am on 30 August, the Craviale works were completed for a 1,060m long, 12.5m high and 13.84m wide tunnel. Completed in less than eight months, the works were said to be among the most complex in the infrastructure schemes planned for the winter games.
