Singapore based Cummins Power Rent has won a long term rental contract to supply power to Singapore’s DTSS project. The initial 12 month contract will see the company power contract T-01, the 5.8km long, 6m diameter TBM bored Changi tunnel. A Cummins 350kVA set will provide baseload power for the concrete batching plant on the Woh Hup-Shanghai Tunnel Engineering JV contract. The rental contract is expected to be extended to 36 months.
