The company added that the machine broke the world record for mechanised excavation of a twin tube tunnel of over 15m diameter.
A ceremony took place on site to celebrate the result, Toto Costruzioni Generali said. The tunnel was designed by Autostrade per l¹Italia, where Toto Costruzioni Generali worked with Martina, the world¹s largest EPBM, manufactured in Germany.
Martina is being used to build a twin-tube road tunnel located between Bologna and Florence. The tunnel is 2,431m long and 13.6m wide. It will accommodate a triple-lane carriageway, including an emergency lane, 3.75m wide each. The tunnel will be equipped with 10 bypass – two of them for vehicles – and 17 SOS posts for emergency calls.
