Hatch Mott MacDonald (HMM) is an award-winning consulting engineering firm with major success in the fields of rail and transit; highway and bridges; water and water resources; wastewater; tunnels; environment; municipal engineering; aviation; ports and harbors; architectural services; and pipeline services. We have earned a reputation for technical excellence on some of the world’s most prominent and challenging projects. We are a global leader in the underground industry and perennially sit atop the list of top Trenchless design firms. HMM is a rapidly growing firm with over 65 offices throughout North America, providing a full range of engineering services, from planning and design through construction management.
We are seeking qualified Trenchless Specialists/Design Engineers to join our team in several locations throughout North America, working on world-class state-of-the-practice projects.
Candidate Specification
- Candidates are sought with a particular focus in microtunneling and horizontal directional drilling.
- Successful candidates will have a BS (MS Preferred) minimum in Civil Engineering or related field with an academic specialty in geotechnical and/or structural engineering.
- A minimum of 5 years of design and field experience in the trenchless and underground design industry in increasingly responsible roles.
- Professional registration is strongly preferred.
- Relocation assistance available.
Job Description
Responsibilities include but are not limited to:
- Selecting and implementing appropriate Trenchless components and technologies that best suit the specific assigned project.
- Developing and overseeing field investigations.
- Providing design of trenchless components, including preparation of contract documents.
To apply please visit our website at www.hatchmott.com/careers – job reference#: 6226
We offer a competitive salary and excellent benefits package, and are an Equal Employment Opportunity Employer.
