Serving the tunnelling industry since 1969.
Ageing immersed tube tunnels are informing a shift in how the industry thinks about performance, from component durability to system performance, or resilience, says Jurriaan van den Berg, design engineering manager at Trelleborg Marine & Infrastructure.
July 13, 2026