HDD Elevation Challenge in Canada
A technically complex and high-risk crossing for a pipeline project in Canada saw HDD chosen for the excavation works. This is a short version of a paper to the No-Dig Show 2026 and is used, edited for space, with permission of the North American Society for Trenchless Technology (NASTT).
