On 3 June a fire broke out at the Lisbon metro construction site in Avienda da Republica that required twelve fire appliances and 50 firefighters to control. No injuries were reported and the cause was attributed to gas leaks.

Serving the tunnelling industry since 1969.
On 3 June a fire broke out at the Lisbon metro construction site in Avienda da Republica that required twelve fire appliances and 50 firefighters to control. No injuries were reported and the cause was attributed to gas leaks.