Palestinian security forces have been working to discover and seal off tunnels used for smuggling in the Gaza strip. Here, armed officers are seen at the entrance and inside a tunnel during an operation to seal the bore discovered in Rafah, on the border with Egypt, earlier this month. Such tunnels have been used to smuggle weapons and other contraband from Egypt.
