Work comprises construction of a section of tunnel in the Causeway Bay typhoon shelter including the associated temporary reclamation, and the subsequent removal of the temporary reclamation after completion of the tunnel. The scheme also includes the Slip Road 8 tunnel structure beneath the existing Victoria Park Road as well as improvements to the existing facilities, and extension of a pedestrian subway and the associated roadworks.
