The 27-year-old man was found to be more than three times over the legal limit for alcohol allowed while driving. He reportedly had not intended to take the underground route.

Serving the tunnelling industry since 1969.
The 27-year-old man was found to be more than three times over the legal limit for alcohol allowed while driving. He reportedly had not intended to take the underground route.