Bernold-Ceresola’s in-house designed and manufactured steel moulds have been supplied to numerous projects around the world, satisfying the highest tolerance and handling demands. The company prides itself on taking local conditions, such as wage rates, quality of raw materials and climate conditions, into consideration.
Bernold-Ceresola’s systems are also popular in the People’s Republic of China, with project references such as the Guangzhou Metro Line 3 North and South Project, Guangzhou Metro Line 2, the Nanjing Metro Line 1, and Beijing Metro Line 5. The company’s latest projects in 2004 are Beijing Metro’s Line 4 and Line 10.
Bernold-Ceresola designs handling concepts and supplies equipment for demoulding, lifting, turning, rotating and moving segments of all weights and sizes.
Tel: +41 58 455 5000
Email: info@bernold-ceresola.com
