TunnelTec provides a range of customised tunnel and vertical conveyors to remove excavated spoil to the surface. The designs are based on field experience and engineering know-how.

Tunnel conveyors are continuously extendable and work at up to 99 per cent availability.

TunnelTec adds: “Another key feature of these tunnel conveyors is the capability of negotiating minimum curve radii with little or no muck spillage. The belt storage system is of modular design that allows for uninterrupted tunnelling.”

The vertical conveyor system is of the sandwich type, which uses two opposite belts to trap the spoil between them and transport it to the top. TunnelTec again: “This system is of compact design, allows steep inclines and is easily maintained and serviced.”

TunnelTec says that by using its tunnel conveyor, an optimal transport system can build up for the project. “Additionally, full service for tunnel construction projects from consulting, project planning up to construction and sale, as well as initial operation of tunnel construction equipment can be offered,” it concludes.

TunnelTec

Tel: +49 2431 948 200
Email: support@tunneltec.de
Web: www.tunneltec.com


A customised tunnel and Vertical Conveyor