HLS Hard-Line Solutions designs, manufactures, installs and services radio remote control systems, exporting all over the world. By conferring with clients on a regular basis, the company says it diligently ensures customers are satisfied with its products. “Within the underground equipment industry, clients almost never require a standard radio remote control,” says Hard-Line. “Modification is often necessary in order to develop a system that properly suits the purpose at hand.”
HLS Hard-Line’s “commitment to innovation” has led it to develop the televideo rock breaker systems, tele-operated LHD systems, hazardous waste handling systems, and a mine wide digital communications infrastructure, the ‘Mine Area Net’.
Hard-Line was the 2006 winner of the Ontario Global Traders award for service exporting.
HLS Hard-Line Solutions
Tel: +1 705 855 1310
Email: sales@hard-line.com
Website: www.hard-line.com
HLS Hard-Line Solutions