Serving the tunnelling industry since 1969.
Excavation has begun on the final tunnel of the HS2 rail project, bringing the high-speed line towards its eventual London terminal, at Euston. Julian Champkin reports.
With a free Tunnels & Tunnelling profile, you can:
Powered by
I consent to GlobalData collecting my details provided via this form in accordance with Privacy Policy