German manufacturer GHH Fahrzeuge specialises in Load Haul Dumpers (LHDs) and dumper trucks for the underground construction and mining industries. “To date, GHH Fahrzeuge has produced and sold more than 2400 LHDs and 400 Dump Trucks and thanks to continued growth, the company has recently relocated to Gelsenkirchen,” says the company. GHH believes its new premises, which it says have been equipped with state-of-the-art production and communication facilities, will further strengthen its market position through improved quality and faster delivery times.
Following the company’s recent part-acquisition of Mine Master (formerly Boart Longyear’s Polish Mining Capital Equipment division, Boart Longyear Sp.z o.o), a range of drilling jumbos (Face Masters), roof bolting machines (Roof Masters), and excavator drilling attachments (Flexi Masters), are also now on offer.
GHH Fahrzeuge
Tel: +49 208 46940
Email: info@ghh-fahrzeuge.de
Web: www.ghh-fahrzeuge.de
A Load Haul Dumper
