Crossrail is an ambitious plan to deliver a new railway for London. Our vision is to create a world-class affordable railway, deliver effective partnerships and project excellence, with high performing teams sharing a clear vision and clear objectives. This is a once in a lifetime opportunity to make a significant contribution to public transport, and the quality of life, in London and the country as a whole.
Working within the client engineering team you will, depending upon your experience, provide leadership or guidance for the heavy civil engineering infrastructure. Responsibilities include the establishment of the requirements, interface co-ordination, design assurance, obtaining approvals and as the project progresses, managing the preparation of tender documentation for construction leading to construction oversight.
As a highly competent civil engineer you will be experienced in the creation of underground space through a broad range of the design and/or construction of tunnels, cut-and-cover structures and shafts. For all roles you must be educated to degree level or equivalent.
For the Head of Tunnels, Shafts and Portals you will be chartered. As a minimum requirement for other roles you must be approaching chartered status. You will need to have good knowledge of safety and CDM regulations, and possess good communication and team working skills.
If you are interested in delivering this world class transport system, contact our retained consultants at Ellis Fairbank and apply online at www.ellisfairbank.com/pressads when prompted enter the reference PTTL51412JNEW or alternatively email rail@ellisfairbank.com Please attach current Curriculum Vitae and full salary details.
We value the diversity that exists in London and aspire to this being reflected in our workforce.
See www.crossrail.co.uk for more information on our company.
