Serving the tunnelling industry since 1969.
After enjoying a long career in civil engineering and most especially tunnelling, and being a strong supporter of the industry and the British Tunnelling Society, Mike McConnell shares his ‘Reflections of an exiled Ulsterman’ in conversation with Julian Champkin.
August 28, 2026