Rutherford Power is a major supplier of temporary electrical equipment and cables for mining and tunnelling projects around the world. Its main line of work is in the supply of electrical equipment packages including generators, transformers, switchgear, distribution equipment, lighting, comms systems and cables.
“Projects can also be undertaken on a turn-key basis, where we take responsibility for the engineering of electrical supply requirements and installation and commissioning of the equipment,” says Rutherford.
Electrical packages are based on the purchase, buy-back or hire of equipment. “This allows clients to gain the maximum benefit of high-quality, reliable equipment at a cost effective price,” the company adds.
Rutherford Power have a substantial fleet of equipment available at strategic locations.
Rutherford Power
Tel: + 61 2 4961 9619
Email: steve.rush@ rutherfordgroup.com.au
Web: www.rutherfordgroup.com.au
Rutherford Power
