The largest trenchless technology conference in North America – the No-Dig Show – takes place over March 30-April 3, 2025, in Denver, CO.
A packed program has been prepared for multitrack technical presentations, an Exhibition area, and networking opportunities with old and new connections.
The No-Dig Show is organised by the North American Society for Trenchless Technology (NASTT).
The location of the large-scale event, in Denver, is a jump across the country, and up into the mountains, from last time, on the coast in Providence, RI. The focus of this edition of NASTT’s No-Dig Show is the same – to discuss underground opportunities and challenges at the smaller diameter scale of tunneling.
The trenchless sector continues to boom in North America as utility demands continue for both new trenchless construction and upgrades on older assets.
As such, key attendees to NASTT’s No-Dig Show are municipalities, contractors, consulting engineers, gas/ electric utilities, and those involved with pipelines and energy, industrial facilities, and both damage prevention and safety issues.
TECHNICAL PROGRAM
The Technical Program has seven tracks:
The tracks will run in parallel over five half-day sessions (March 31-April 2). The list below shows the different themes assigned to a track across the Technical Program.
Except for Track 2 [Horizontal Directional Drilling (HDD)], the track generally won’t have a single focus.
Track 1: Microtunneling; Direct Pipe; Large Diameter Tunneling; Auger Boring
Track 2: Horizontal Directional Drilling (HDD)
Track 3: Trenchless 101; Project Planning & Delivery; Construction Project Management
Track 4: Emerging Technologies; Pilot Tube; Pipe Bursting/Pull/Push; Grouting
Track 5: CIPP; Manhole; Pipe Ramming
Track 6: Wastewater Pipeline Rehabilitation; Gas; Sliplining; Water Main Rehabilitation
Track 7: Condition Assessment; Research
TRAINING
The events schedule, as developed at this point, includes a number of training courses, such as:
At the start of the event, on March 30, a day ahead of the start of the Technical Program, there will be two half-day sessions on:
- Introduction to Trenchless Technology – New Installations
- Introduction to Trenchless Technology – Rehabilitation
After the main Technical Program has concluded, there will be a range of specialized training courses, each run as two half-day sessions, over April 2-3. They will be run in parallel. The courses are:
- CIPP Good Practices
- HDD Good Practices
- New Installation Methods Good Practices
- Pipe Bursting Good Practices
- Municipal Sewer grouting Good Practices
- Sewer Laterals Good Practices
- Direct Steerable Pipe Thrusting Good Practices
The courses can be signed up for when registering for the main No-Dig Show.
SOCIAL NETWORKING
Before all that – before the main technical program and through the event – there will be a number of social networking events.
March 30: Mile High Mixer (you’ll need a ticket)
March 31: Opening Breakfast (pre-register)
March 31: after the first full day… Meet & Greet, Cocktail Hour and a Silent Auction
April 1: after the second full day…Casio Royale (ticketed event)
April 2: social over but last big networking – in Exhibition Hall.
VENUE AND REGISTRATION
No-Dig Show 2025 is being held at the Colorado Convention Center, in Denver.
Early bird registration rates are available for bookings and payments before March 1, 2025, with NASTT member preferential rates as well as rates for non-members. There are also options to join ticketed networking events, separate and additional to the regular conference registration.
Go to: www.nodigshow.com
SPONSORS OF NO-DIG SHOW 2025
The Premium Sponsors of No-Dig Show 2025 are:
Platinum
Azuria Water Solutions
Michels Trenchless
Plastic Pipe Institute
RapidView
TT Technologies
Gold
BTrenchless (division of BT Construction)
Core & Main
Geonex
OnPoint HDD
Reline America
Sherwin-Williams
Thompson Pipe Group
Silver
Aecom
Akkerman
Allied Trenchless
AOC Formulations
Aquapipe
Bond Civil & Utility
Bothar
Brownline
Carboline
CCI & Associates
Digital Control
Environmental Noise Control
Hammerhead Trenchless
Herrenknecht
Hobas Pipe USA
Huxted Trenchless
Northeast Remsco Construction
Innovations Amplified
Interplastic Corp
IPEX
Jacobs
Jennmar Civil
Mears Group
Minicam
NuFlow Technologies
Pipeline Renewal Technologies
Primus Line
Puris
Rausch
Sekisui SPR Americas
Soleno
Staheli Trenchless Consultants
Stantec
Structural Technologies
Sunbelt Rentals
Super Products
Underground Magnetics
Vac Con
Vermeer
Warren Environmental
Waterline Renewal Technologies
WSP
Xylem
