Trenchless equipment manufacturer TT Technologies recently introduced the new Grundoram Apollo pneumatic pipe rammer. At 32” in diameter, the Grundoram Apollo is believed to be the world’s largest pneumatic pipe rammer. The Apollo is designed for trenchless steel casing installations from 56” to 122” in diameter, with diameters up to 147” and larger possible, at lengths up to 200ft.
The Apollo is 174” long and delivers 30,000ft-pounds of impact energy at 180 strokes per minute. Standard ramming accessories are available for 60”, 72”, 80”, and 84” diameter pipe. TT Technologies offers a complete line of pneumatic pipe rammers.
TT Technologies
Tel: +1 800 533 2078
www.tttechnologies.com
The Grundoram Apollo
