BETEK offers complete tool systems for road header machines, long wall shearers and continuous miners including holders as a solution from a single concept – with locking systems according to requirements and a shank diameter of 25 to a step shank 35/43mm.
The tool line for TBMs includes scraper blades and reamers as well as a large selection of weld-on teeth. BETEK produces tools for all machines – including scraper blades for Herrenknecht systems.
The tungsten carbide qualities are specifically adapted to the application and excel through their high wear-resistance. A high feed rate, long service life and short tool changing times ensure a high daily production volume.
BETEK supports its customers in selecting the right tools and advises when to change the tools. BETEK helps to solve the most demanding drilling tasks. If required, BETEK can also develop customised solutions. A wide product range reflects the wealth of experience that BETEK has gained.
BETEK
Tel: +49 7422 565 130
Email: e.staiger@betek.de
Web: www.betek.de
