ABC Manufacturers of Canada
Tel: +1 306 653 4303
Fax: +1 306 653 3890
Email: thorinsong@abccanada.ca
ABC Manufacturers of Canada supply flexible ventilation ducts for tunnel ventilation systems. ABC claims to be unique in that all products are made in the same facility.
This allows for lower costs and complete quality control. ABC has just developed a new type of high-pressure ducting. The first two orders of ABC High-Pressure Flex have been shipped to the 22km Parbati Project, India, and to the high pressure Manhattan Sewage Project in New York. ABC has pioneered the use of low-resistance, high-strength couplings and offer Metal, PVC, Zipper, Velcro, Butterfly Clamp and Bi-Directional Couplings. ABC has just initiated possibly the largest field study of its kind to provide ventilation professionals with real data to compare with their own software programs and current norms such as the SIA 196.
ABC’s patented TuffTube used in high abrasion and flutter situations is still available for the toughest of applications.
ABC Industries
Tel: +1 574 267 5166
Fax: +1 574 267 2045
Web: www.abc-industries.net
ABC Industries offers a complete line of ventilation products for the tunnelling marketplace. Complete systems are available including fans, brattice cloth, rigid tubing, flexible ducting and AutoFeed cassettes.
MineVent is ABC’s Layflat Blower Tubing. It is available in several fabric choices, including VentaStat fabric, which complies with flame and anti-static requirements of several mine departments worldwide. The convenient AutoFeed Tubing Cassette permits pre-loading of MineVent Blower Tubing.
MineDuct is a wire-reinforced flexible exhaust tubing and is available in standard fabrics and anti-static VentaStat RipStop material. RigiDuct is ABC’s fibreglass ducting derived from crisscrossed spiral rovings of fibreglass. It has more strength than non-filament wound fibreglass or PVC ducting, yet it is as light as any other plastic duct. The fibreglass and polyester resins combine to make RigiDuct highly resilient to attack from acid or alkaline conditions. It is available in both round and oval configurations, and has a variety of coupling accessories to choose from.
ABC also offer a wide range of Vane Axial Fans specifically for auxiliary ventilation purposes.
Air Power Products
Tel: +44 1909 519519
Fax: +44 1909519518
Email: info@airpowerproducts.co.uk
Designed, tested and proven in the Australian mines, Air Power Products lightweight 50mm multi-purpose flap valve compressed air double diaphragm pump is now also available in the UK. At only 25kg this versatile pump is capable of 500l/min and up to 70m head, and will take particles up to 32mm spherical. The unit is anti-icing, and requires no lubrication. It is available in a variety of materials, including flame retardant anti-static and is capable of working with fluids in excess of 50ºC. A compatibility guide is available on request.
The Alpine Group
Tel: +1 814 238 1114
Fax: +1 814 466 3193
Email: alpineamerica@aol.com
Advanced Excavation & Cutting Technologies (AEC Technologies), a member of the American Alpine Group, has after six years of research developed cutter bits (picks) which are tipped with PDC ‘diamond’ inserts.
Diamond has 300 x longer wear resistance than tungsten-carbide. The company claims these picks permit cost-effective excavation of hard and highly abrasive rock and minerals. Cutter heads of roadheaders and rotary cutter attachments for excavators and tunnel shields for a range of TBMs can be laced with these novel diamond picks.
Amco Plastics
Tel: +44 1709 872574
Fax: +44 1709 879020
Email: phindle@amco-plastics.co.uk
Web: www.amco-plastics.co.uk.
Amco Plastics, part of the Amco Corporation, is currently supplying its largest ever ducting project to ventilate a tunnel on the high-speed rail link from Madrid to the North West of Spain. Amco won the US$483,000 contract to supply ducting for the North side of the tunnel, which runs for 26km beneath the Guadarrama mountains, through their Spanish agent, Abyo of Madrid.
The ducting is 2.5m in diameter and made up of 100m lengths, each weighing over 500kg. The ventilation system is made up of two types of ducting. Heavy-duty PVC coated polyester is used in the majority of the ducting while extra heavy-duty rip stop PVC coated polyester is used in the high-pressure part of the system.
The ducting has been designed to deliver up to 40m3 per second of fresh air along 15km of the 8.5m diameter tunnel. It incorporates a dual suspension design that maximises clearance for traffic, with a customised coupling system for ducts.
The company’s product range can be supplied in special materials such as high and low temperature, anti-static, abrasion resistant and Kevlar reinforced.
Brush Transformers
Tel: +44 1509 611411
Fax: +44 1509 610550
Email: sales@btl.fki-et.com
Web: www.fki-et.com/btl
Brush Transformers is one of the largest flameproof transformer manufacturers in the UK. Its current range of certified flameproof equipment includes transformers from 50kVA to 3500kVA, transformer low voltage protection chambers, and high voltage switchgear rated up to 12kV.
Key Benefits include: All equipment is type tested and certified; design and manufacturing to customer’s specification; extensive service life through proven technology; repair and re-conditioning; erection and commissioning; after sales maintenance and spare parts service.
Condat
Tel: +33 4 7807 3845
Fax: +33 4 7807 3767
Email: mo.jalmain@condat.fr
The importance of being ‘clean’ in tunnel construction has led to a new era of consciousness towards ground pollution. An issue highlighted by national environmental legislations.
Condat offer a solution to users, with a complete range of ‘green’ products for TBMs. As an example, the construction of the TGV tunnel under the Groene Hart Park, in the Netherlands, bored using the world’s biggest TBM, needed to be perfectly green. Condat was selected to provide products for tightening the seal brushes and the main bearing and for lubricating the hydraulic systems. The products prove that TBMs can now operate using green products.
Still anticipating future customer needs, Condat also offers biodegradable and fireproof products for any TBM application.
Crowcon Detection Instruments
Tel: +44 1235 553057
Fax: +44 1235 553062
Email sales@crowcon.com
Web: www.crowcon.com
Crowcon has designed a new personal gas monitor for use in demanding conditions. Monitoring up to four gases, Tetra has a single button to control all functions, and a backlit display, giving simultaneous viewing of all gas readings, alarm conditions and battery life.
If a hazard is detected, Tetra gives rapid and effective warning of the presence of gas. The user is alerted by extremely bright blue and red LED beacons and a powerful 90dBA alarm. Alarm tones are adjustable to ensure easy discrimination from noisy machinery. An integral vibrating alarm is also a standard feature.
Tetra is easily customised for different applications: intelligent,
user-changeable sensors for a wide range of gases are pre-calibrated to allow ‘plug and play’ operation. Two versions are available: a rechargeable unit using lithium-ion batteries for 12 hours’ operation per charge; and a version powered by three AA alkaline batteries. For testing confined spaces prior to entry, Tetra can be specified with an optional built-in electric sampling pump or used with a separate manual aspirator.
Deilmann-Haniel
Tel: +49 231 2891 289
Fax: +49 231 2891 314
Email: tech@deilmann-haniel.de
Web: www.dh-ms.com
Deilmann-Haniel produces customised drill feed attachments that can be fitted without modification to a machine’s existing hydraulics. Each system merely requires one pressure and one return line, connected via quick-release couplings. Any standard quick-release device can be used to adapt the feed to an excavator jib. A wide range of feeds with different profiles and thrust systems are available. The feeds can be supplied in any length increment and can also be fitted with a variety of accessories.
For extension drilling and screen-pipe installation work the drill feeds can be fitted with hydraulic clamps and gripper systems offering the solution when high-performance extension drilling is required.
High functional reliability is ensured through the use of purpose-built cable and radio remote control systems that have been specially designed to give continuous service under extreme operating conditions. The use of digital and proportional control technology allows precise, rapid positioning of the drilling attachment.
Flexadux Plastics
Tel: +44 1427 617547
Fax: +44 1427 811170
Email: sales@flexadux.co.uk
Web: www.flexadux.co.uk
Flexadux Plastics are manufacturers and suppliers of complete ventilation systems with forty years experience. Flexadux ventilation systems incorporate Fans manufactured and supplied by the UK based company Matthews & Yates.
Flexadux offer both ducting and accessories, which can be flame retardant and/or anti-static, in a variety of materials: a) Flexible PVC coated polyester fabric; available for forcing applications (type FR) in diameters from 250mm and lengths up to 100m; for exhausting applications type SR is available in diameters from 250mm and lengths up to 10m, subject to the helix pitch required for the customers project.
b) Rigid GRP Phenolic ductwork where corrosion/damage is a problem; available in diameters from 200mm and lengths up to 6m, in either a Bell & Spigot connection or flanged.
c) Steel ducting (incl. galvanised and spiral) particularly for shafts; steel ductwork is available in most diameters and lengths up to 6m.
ITT Flygt
Tel: +44 115 940 0111
Fax: +44 115 940 0444
Email: smurphy@golleyslater.co.uk
Web: www.flygt.com
Two new slimline pumps have been added to ITT Flygt’s hard working Bibo submersible pump range, for use in active dewatering applications. The new Bibo Slimline models, which handle up to 55l/s and pump up to heads of 70m, can operate in pipes from 300mm-500mm in diameter. They are therefore ideal for use in confined space environments.
The portabile pumps come in two sizes, 295mm and 360mm in diameter, and ranging between 3.7kW and 8kW in power.
To suit their tough operating conditions Bibo Slimline pumps are made from cast aluminium, have an outer casing of stainless steel and multi-vane impellers made from hardened cast iron. In addition the pumps have Flygt’s unique double sealing system fitted as standard – two seals that work independently of one another but provide double protection. They also have the ‘spin-out’ feature, which expels particles from the seal chamber.
Gas Measurement Instruments
Tel: +44 141 812 3211
Fax: +44 141 812 7820
Email: sales@gmiuk.com
Gas Measurement Instruments (GMI), is a privately owned company based in Renfrew, Scotland. The company supplies a range of both portable electronic gas detection products, and fixed gas detection systems. GMI has just released its new confined space monitor, the V!SA. This single-button use instrument features: a robust rubberised moulding, providing high impact and shock resistance; pump, diffusion, or both together, allowing a pumped sample for pre-entry checking, and diffusion operation when in confined space, thus maximising battery life; up to 5 gases using ‘plug and play’ sensors, allowing easy change of gases for different applications; very loud (95dBA) penetrating and distinctive audible alarm, together with high visibility large area visual alarm.
Grindex
Tel: +468 606 66 00
Fax: +468 467 455 328
Web: www.grindex.com
Tuff-Solo from Grindex further extends the company’s drainage pumps range. The Tuff-Solo, is a small powerful sludge-pump, with a capacity of 420l/per/min and handles sludge with solids up to 38mm. Its weight is only 15k, making it truly portable. The low weight makes it ideal for situations demanding instant action, says Göran Holmén, president of Grindex. There is a great demand for sludge pumps that are lightweight and easy to carry. A pump with the corresponding capacity normally weighs around 30k.
Tuff-Solo is made of aluminium and stainless steel; the pump housing and impeller are made of polyurethane, to ensure excellent wear-resistance when pumping abrasive liquids. Tuff-Solo comes in 1 and 3-phase supply. The 1-phase model is equipped with both start and run capacitors for optimised start and motor performance. All Tuff Line-pumps are protected against overheating. The pumps can run dry, due to the unique Grindex air valve. The pumps are easy to service and kits with the most common spare parts are available.
Halfen-Deha
Tel: +49 2173 970 440
Fax: +49 2173 970 450
Email: wsm@halfen-deha.de
Web: www.halfen-deha.de
The Deha spherical head anchor, provided internationally by the sales partners of the Halfen Group, is normally used as a transport anchor by manufacturers in the pre-cast industry. However, due to its high load capacities and rotating features it also functions as salvage anchor.
A particular requirement of most fire brigades is to cast in a sufficient number of salvage anchors into the tunnel walls. These are an indispensable help for rescue operations in order to disentangle cars in the event of an accident.
Due to its excellent product features the Deha spherical head anchor is given priority upon planning. Each anchor has a load capacity up to 20t, and thus is sufficient for these special (emergency) cases. In addition, the wear-resistant lifting clutch rotates freely providing the required flexibility.
JP Jensen Ventilation
Tel: +46 40 689 2100
Fax: +46 40 689 2110
Email: info@jp-ventilation.com
JP Jensen Ventilation, formed in 1879, is one of the oldest companies in the world specialising in processing PVC-coated material. JP Jensen’s wide range of services includes everything from ducting system planning and assistance with installation, to reconditioning. Customers may choose between buy, rent, investment or logistic solutions.
Amongst the product range is JP Superjoint – a patented coupling for ductings, to ensure straighter airflow and airtight systems. The speed of the air changes if the cross-section of the ventilation canal changes, as is the case with traditional steel couplings, zip and carbon couplings. It is also certified that the same ducting connections have a leakage of different grades. Changing the speed results in an alteration of the dynamic pressure, with consequent loss of energy. A straighter and tighter tube in the coupling area leads to better results at the end of the ventilation canal and reduced costs for high kW performance.
JP Superjoint is a patented solution for creating a straight airflow in a flexible ducting. This is a unique solution designed to eliminate the two most common energy thieves in the underground ventilation system, airflow (turbulence) and leakage in the joints. Depending on the size of ventilation system, the JP Superjoint offers savings in the range of 10-20%.
Lubrizol Engine Control Systems
Tel: +1 905 853 5500
Fax: +1 905 853 5801
Email: mibe@lubrizol.com
Lubrizol Engine Control Systems (ECS) is pleased to offer the Combifilter, an electrically regenerated diesel particulate filter. The Combifilter is comprised of an integrated diesel particulate filter and silencer assembly and a regeneration station. The filter assembly typically removes >90% of diesel particulate (PM) from the engine exhaust. The filter particles (soot) are stored in the filter centre body until the filter centre body is regenerated.
Regeneration is a process by which the loaded filter centre body is heated to the temperatures necessary to burn the collected particulate into trace amounts of inert ash, thereby renewing or regenerating the filter centre body and maintaining an environmentally safe workspace.
The filter assembly can be further combined with an AZ oxidation catalyst for the reduction of the gaseous pollutants CO and HC. ECS designs and manufactures the Combifilter to effectively reduce Particulate Matter (PM) from mining, materials handling, off-road, and on-highway vehicles. The Combifilter has been evaluated by numerous global governing bodies for verified emissions reductions.
Neotronics
Tel: +44 1279 307100
Web: www.jmwlimited.co.uk
Neotronics claims that its new Impact gas detector stands above the competition due to its ease of maintenance and calibration.
The Impact utilises an intelligent cartridge sensor system having a life of 12-18 months. When expiry of the cartridge is indicated by a calibration failure it is simply replaced and the instrument re-calibrated.
The Enforcer calibration accessory is a portable device into which a canister of traceable test gas is screwed. The Impact is simply clipped into the Enforcer and, at the touch of a button, calibration commences. In under two minutes, calibration is complete and the Impact will indicate pass or fail accordingly. The controlled exposure also greatly reduces test gas wastage with approximately 200 calibrations available from each canister.
The company claims that the combination of cartridge based sensors and the Enforcer calibration system drastically reduce running costs and downtime, ensuring that the Impact is available when required.
OMVE Vezzani
Tel. +39 0522 831360
Fax +39 0522 831007
Email: omv.srl@tin.it
Web: www.omve.it
Since its foundation OMVE Vezzani has produced products for the tunnel and construction markets including a full range of galvanised steel discharge and suction pipes, pump connections/flanges fittings, strainers and polyhose fittings. All are available with lever lock quick disconnect couplings in 2″-2″ sizes.
Over the years OMVE Vezzani has focused on, and experienced, a constant development thanks to its customer-oriented strategy on an international level, which allows the company to export to more than 35 countries all over the world.
Schwing-Stetter
Tel: +49 23 25 9870
Fax: +49 23 25 729 22
Email: info@schwing.de
Web: www.schwing.de
Schwing-Stetter has recently announced a number of developments to its range of portable concrete pumps. The BP 8800 features a higher output drive and a more economically efficient hydraulic system. Compared with its predecessor, which had two driving engines, the BP 8800 is equipped with just one 419kW diesel engine which is medium-cooled and 5% more powerful. In conjunction with the new drive, the further developed hydraulic system makes for an exceptional operating capacity. Depending on its specification, the new BP 8800 pumps up to 165m3 concrete per hour, generating a concrete pressure of up to 250 bar.
The KVM 34 X truck-mounted concrete pump has been thoroughly redesigned with a new, flow-optimised control block with 50% less power loss, and an improved open hydraulic circuit increase economic efficiency by the cutting of fuel consumption. Other impressive features of the new 34 X are a 20% higher boom speed, a 60% higher outrigger speed and operator-optimised ergonomics. With respect to servicing and maintenance, accessibility to the working and inspection points has been further improved.
In the field of truck mixer concrete pumps, Schwing-Stetter announced the release of its FBP 600 RK with a 21m boom, truck mixers (AM 9 FHC, AM 8 FHC with conveyor belt) and its H 2.25 N horizontal concrete mixing plant.
Securiton
Tel: +41 31 910 11 22
Fax: +41 31 911 25 32
Email: export@securiton.ch
Web: www.securiton.ch
Based in Switzerland, Securiton has been dedicated to electronic fire detection since 1948. Securiton develops and manufactures a large range of different fire detection systems to fulfil broad customer needs, from tunnels to commercial buildings. Today, hundreds of tunnels are protected by Securiton Fire Detection Systems worldwide. The SecuriSens TSC 511 fire detection system features fast and reliable fire detection. Based on the principle of temperature differential measuring, efficient operation is guaranteed under very harsh ambient conditions such as dust, humidity, corrosive gases and high electro-magnetic interference.
The PU-coated sensor cable holds semiconductor type temperature sensors. The sensors are located at regular distances (typically 7.2m) and are continuously measuring the ambient temperature. The temperature sensors are monitored via the LISA communication bus and continuously polled for the actual temperature value. The TSC 511 system software evaluates temperature variations and activates alarm signals. The tunnel temperature profile can be viewed on a standard PC.
SMJ
Tel: +1 970 243 4326
Fax: +1 970 243 1213
Email drjenkins@smjfans.com
Web: www.smjfans.com
Design and development is the driving force behind SMJ in the continuing effort to provide clean air to the tunnelling industry. With single and two stage fans ranging from 300mm to 4.6m and high pressure contra-rotating, two to four stage fans, which range between 300mm and 1600mm.
All units can be driven either electrically, pneumatically or hydraulically and can be constructed with direct, belt or shaft drive configurations. High performance scrubber systems [range] remove the harmful airborne particulates quartz, cristobalite and tridymite. These innovative scrubber systems have an extremely small footprint yet have a higher efficiency of dust removal compared with much larger systems.
Round and oval cassette systems make the arduous task of duct payout virtually effortless. These cassettes are built to accommodate duct sizes of 300mm to 2134mm and have a capacity of 100m-150m of duct. Newly designed and tested silencers provide a reduction in the noise produced by high-pressure fans.
Staplex
Tel: +1 718 768 3333
Fax: +1 718 965 0750
Email: info@staplex.com
Web: www.staplex.com
Staplex Model TFIA High Volume Air Sampler is designed for collection sampling of airborne particulates as small as .01 micron. Using various types of filter media, Model TFIA tests for environmental and industrial dusts, radioactive particles, hazardous wastes, as well as many research and safety conditions.
Air flow is measured by means of an indirect variable orifice meter that is scaled for rates up to 70 CFM. This lightweight and portable Air Sampler can operate for spot or continuous sampling both indoors and outdoors. Model TFIA is available in 110 VAC, 220 VAC, and 24 VDC and can use interchangeable filter holders.
Sud Chemie
Tel.: +33 4 75 57 8330
Fax: +33 4 75 57 4362
Web: www.sud-chemie.com
Email: laurent.nicolas@sud-chemie.fr
Sud Chemie Group offers a comprehensive range of products for shield tunnelling, focusing on performance drilling fluids such as water well drilling, soil investigation drilling, special foundations and other trenchless technologies (horizontal directional drilling). Sud Chemie has been involved in many tunnelling projects across Europe and Asia, be it EPB technique or slurry shield technique. Recent references include the Lefortovo bored tunnel in Moscow, the Socatop ring road tunnel in Paris, Toulouse metro – Lots 4, 5 and 3 and Singapore’s DTSS tunnels.
Svebra
Tel: +46 565 689410
Fax: +46 565 711215
Email: svebra@toppteknik.se
The lightweight quick-coupling steel pipe system supplied by the Swedish company Svebra has proved cost effective, easy to install and durable. The lightweight pipe and the flexible coupling, quick and easy to assemble, provide an ideal solution to both temporary and permanent installations for water and compressed air in tunnelling works and on construction sites. Standard lengths assist planning and installation, and make storage and stock keeping simple. Hot-dip galvanising ensures that the pipes survive well in hostile underground environments, and in open storage between uses.
