The Robbins Company specialises in the design and manufacture of continuously extending conveyors for use behind rapidly excavating TBMs. The company also produces muck removal systems for drill and blast tunnels, mines, and quarries.
Patented self-adjusting curve idlers can guide a belt through curved tunnel paths, while booster drives can maintain low belt tension for even the longest tunnels, claims the company.
Depending on the project, any of the following belt types can be produced to fit the needs of the contractor: vertical conveyors, overland conveyors, stacker conveyors, and specialty conveyors. All Robbins conveyor systems can be manufactured using either steel cable or fabric belt. Custom designed mucking systems, such as those for rubber-tired vehicles, are also available.
Robbins rail systems are said to be setting an industry standard with a wide range of equipment. Robbins designs and manufactures flat cars, muck cars, transport cars, concrete/shotcrete agitator cars, personnel cars, and shotcrete application cars.
The Robbins Company
Tel: + 1 253 872 4484
Email: homeb@robbinstbm.com
Web: www.robbinstbm.com
A curved tunnel path Patented self-adjusting curve idlers
