ABS claims to offer a ‘one-stop shop’ for reliable dewatering solutions, covering all demanding requirements including submersible drainage and sludge pumps or engine driven pumps. Additions to the company’s pump range during 2007 include:
The ABS Transportable Sludge Pumps JT 15 to 250 (output P2 of 1.3kW to 25kW), said to be robust and safe to run dry. Different sizes available for portable use in narrow shafts (opening Ø600mm).
ABS Sludge Pumps JS 12 and 15 (output P2 of 0.9kW to 1.3kW). Slim and compact, with a large spherical clearance.
ABS Diaphragm Pumps for critical media with high solid content. Self-priming pump-ends for use outside the pit.
ABS also offers a rental service for customers requiring pumps at short notice. “For inspections, services, repairs and modifications, our network of ABS service support points and ABS service partners is always ready to help,” adds the company.
ABS Group
Tel: +46 40 350470
Email: info@absgroup.com
Web: www.absgroup.com
The ABS Transportable Sludge Pumps
