Serving the tunnelling industry since 1969.
Four decades on from the Channel Tunnel, our machines and our methods have never been better — so why do our major projects still overrun? The answer lies less in the ground than in what we have done to the contract and the consent, says Alastair Smith, Chair, British Tunnelling Society, in a guest editorial.