Two 10.2m diameter Robbins/Mitsubishi TBMs will arrive on the site of the 7.5km long twin-tube Adalajis rail tunnel in Spain next month, ready to start boring in September.

Serving the tunnelling industry since 1969.
Two 10.2m diameter Robbins/Mitsubishi TBMs will arrive on the site of the 7.5km long twin-tube Adalajis rail tunnel in Spain next month, ready to start boring in September.