The project is a 600m-long PHP 717M diversion of the Sumag River being carried out for client Metropolitan Waterworks and Sewerage System (MWSS).

Serving the tunnelling industry since 1969.
The project is a 600m-long PHP 717M diversion of the Sumag River being carried out for client Metropolitan Waterworks and Sewerage System (MWSS).