BHR Group reports strong support for its 10th international conference on Aerodynamics and Ventilation in Vehicle Tunnels: Principles, Analysis and Design. Particular interest has been shown on ventilation for smoke removal, and the aerodynamic interaction between rolling stock and infrastructure. Over 90 original papers have been submitted for the conference to be held in Boston, US on November 1-3, this year. North American co-sponsors include Parsons, Brinckerhoff, Quade & Douglas, ICF Kaiser Engineers, American Warming & Ventilating and the US National Fire Protection Association.
More details from Tracey Wheeler, BHR Group, The Fluid Engineering Centre, Cranfield, Bedfordshire MK43 0AJ, UK;
tel.: +44 (0)1234 750422; fax: +750074;
e-mail: twheeler@bhrgroup.com
