It is part of the route from London Paddington to Bristol Temple Meads and has been awarded grade II listen status. The tunnel, which opened in 1841, is 1.83 miles (2,937m) long and when it opened it was the longest railway tunnel in the world.

Serving the tunnelling industry since 1969.
It is part of the route from London Paddington to Bristol Temple Meads and has been awarded grade II listen status. The tunnel, which opened in 1841, is 1.83 miles (2,937m) long and when it opened it was the longest railway tunnel in the world.