The British Tunnelling Society (BTS) has announced that its 35th Annual Dinner will take place on Friday, 23 May 2025, at The Brewery, London.
The event will bring together professionals from across the tunnelling and engineering sectors for an evening of networking and industry engagement.
The programme includes a champagne reception, a formal dinner, and a keynote speech by Reverend Richard Coles. The event follows a black-tie dress code.
Tickets are priced at £160 per person, with tables of 10 available. BTS Young Members and Retired Members are eligible for concession rates and can obtain a discount code by contacting website@britishtunnelling.com.
A table plan is available for attendees to select preferred seating arrangements. The plan is updated periodically, and attendees are advised to provide multiple seating preferences when booking.
The dinner menu will be confirmed later, with details communicated to registered attendees.
Bookings are now open, and additional information can be found in the BTS Dinner 2025 Flyer.
