The envoy of the Ukrainian president to Crimea Serhiy Kunitsyn, said it is necessary to build a road tunnel for transport under the Kerch Strait.
“At least at present, the arguments for a road tunnel are very persuasive for me,” Kunitsyn said at a press conference in Simferopol last month.
Kunitsyn noted that a design for such a road tunnel was drafted 10 years ago when he was the prime minister of Crimea. He said that at that time also he had supported the idea of the construction of a tunnel under the Kerch Strait.
