Shanghai Tunnel Engineering has completed construction of the US$50M, 3.5km long Ningbo-Changhong road tunnel in China’s Zhejiang province. The link was built under a BOT franchise.

Serving the tunnelling industry since 1969.
Shanghai Tunnel Engineering has completed construction of the US$50M, 3.5km long Ningbo-Changhong road tunnel in China’s Zhejiang province. The link was built under a BOT franchise.