London Underground‘s Circle Line has re-opened a week late without work on tunnel strengthening being finished. The line was supposed to be closed for nine weeks this summer as steel beams were installed to support the weak tunnel roof. A broken sewer pipe delayed the opening, but non- completion of the support work was due to ‘logistical problems’. The strengthening work is now scheduled to be completed at weekends.