In a story on BEA Systems Inc that ran in Monday’s issue of
Computergram (CI No 3,407), Warburg Pincus Ventures was incorrectly
referred to as SBC Warburg.

Serving the tunnelling industry since 1969.
In a story on BEA Systems Inc that ran in Monday’s issue of
Computergram (CI No 3,407), Warburg Pincus Ventures was incorrectly
referred to as SBC Warburg.