Atlas Copco have just released the third edition of the 154 page “Face Drilling” book. The book is designed as a reference work for tunnellers and miners, with case studies from 16 projects worldwide that showcases Atlas Copco equipment applications.
Veikko Suvanto, product line manager of Underground Drilling Equipment at Atlas Copco Rock Drills AB, says the publication will stimulate everyone with an interest in tunnelling and underground mines as “there is always a better way of doing it.” Face Drilling is available from Atlas Copco at www.min-con.com