Gomes has worked on major projects across Europe, Asia and the Americas providing his expertise across all stages of a project, from feasibility studies through to detailed design and construction supervision. His experience encompasses a broad range of ground conditions, ranging from very soft ground to hard rock conditions, and various construction methods.
Gomes’s project experience includes:
- Metros in Santiago de Chile, Porto, London, Bangkok, Singapore and Taipei
- Railway tunnels including the Taiwan High Speed Rail
- Urban and non-urban road tunnels including the Concession Road Tunnel La Linea 2nd Tube (Colombia), AVO
- Expressway Urban Tunnels (Chile), City Tunnels Porto and Schmitten Tunnel (Austria).
- Large underground infrastructure projects for mining and numerous Hydropower projects in Chile and Latin-America.
Gomes has published more than 50 technical papers and articles and regularly provides high-level advice to contractors, consultants and clients on technical, forensic and contractual matters. He has been an Adjunct Professor for Tunnelling at the University of Chile and has been involved in worldwide training activities for engineering professionals. A member of the International Tunnelling and Underground Space Association (ITA-AITES), he is currently serving as a Vice President on the organisations’ Executive Council.
