This year saw entries saw entries competing across 7 categories with the 18 strong judging panel chaired by Jenny Yan, the immediate past-President of the ITA.
The full lists of finalists, by category, are as follows (in alphabetical order):
FOR THE CATEGORY "MAJOR PROJECT OF THE YEAR" (WITH A BUDGET OVER 500 M€)
- EOLE – Paris East-West Rail Express Link (France)
- Nanjing Yanziji Yangtze River Tunnel (China)
- Qinling Mount Water Conveyance Tunnel of Hanjiang River to Weihe River Water Diversion Project (China)
FOR THE CATEGORY "PROJECT OF THE YEAR" (WITH A BUDGET BETWEEN 50 AND 500 M€)
- Comprehensive Project of Shenzhen Binhai Avenue (Headquarters Base Section) Coastal Wide Underground Space (China)
- Jinan Jiluo Road Yellow River Tunnel (China)
- Sociedad Concesionaria Vespucio Oriente (AVO1) (Chile)
FOR THE CATEGORY "PROJECT OF THE YEAR INCL. RENOVATION" (WITH A BUDGET UP TO 50 M€)
- Mount Royal Tunnel – Double Arch Replacement & Rehabilitation for the REM Project (Canada)
- Northern Cross-Over of Shiraz Subway Line-2 (Iran)
- Reclamation of Complex Geological Wastewater TBM Tunnel under Macau Guia Circuit (China)
FOR THE CATEGORY "TECHNICAL INNOVATION OF THE YEAR"
- Application of Intelligent Construction Technology in Large Diameter TBM Tunnel (China)
- Building Blocks in a Foundation Pit ——Prefabrication and Assembly Construction Technology for Metro Stations (China)
- Riverlinx Silvertown Tunnel – TBM Launch and Rotation (United Kingdom)
- Technology of Controlling Large Deformation of Soft Rock by Prestressed Anchor Cable in Extra-long Mountain Tunnel (China)
FOR THE CATEGORY "BEYOND ENGINEERING"
- Digital Construction Facilitates High-quality Development of Engineering (China)
- Permanent Sprayed Concrete Linings on Mumbai Metro Line 3 Sahar Road crossover cavern (India)
- Risk Management Technology and Application of Large Diameter Slurry Shield Crossing the Yellow River (China)
FOR THE CATEGORY "PRODUCT/EQUIPMENT INNOVATION OF THE YEAR"
- Automated control survey for small diameter with limited accessibility. (Germany)
- AVN 800 HR – MTBM for microtunnelling in hard rock (Germany)
- Hard Rock Shield + earth pressure + slurry three-mode TBM (China)
- Tunnel Intelligent Comprehensive Inspection Equipment (China)
FOR THE CATEGORY "YOUNG TUNNELLER OF THE YEAR"
- Arjun Raja Shivasami Australia
- CLÁUDIO DAVID CABRAL DIAS Portugal
- Massimiliano Terenzi Italy
- Ricardo Manias United Kingdom
- Russell Connors Australia
You can see the full information here.