Beijing Construction Engineering Company and Bilfinger + Berger are to invest a further US$9M in their joint venture Chang Cheng Bilfinger Berger Construction Engineering Corp to lobby for the construction of Beijing’s No.5 subway line. The 27.7km long line would run north from the city to the site of the 2008 Olympic Games.
