Those interested in the strongly recovering Korean construction market are invited to visit Geotech 2000 in Seoul on December 13-16 2000. This international tunnelling, underground construction and GIS/GPS fair is organised with the Korean Tunnel Engineering Association. Further information can be obtained from the organiser’s website: http://www.geotechkorea.com
e-mail: kimi93@thrunet.com