Any extension of Toronto’s 6.4km long Sheppard subway line will be constructed later rather than sooner, after the Toronto Transit Commission (TTC) sold its remaining TBM back to Lovat. The two Lovat machines bought for US$10.7M, were sold back for US$3.6M, delaying any metro construction.
