Iraq plans to build a metro under Baghdad, a project that was put on hold when the Iran/Iraq war erupted in 1980, the Al Rai Weekly reports from Baghdad. The transport ministry is to review an earlier study and the possibility of starting construction with the purpose of easing transport in the capital, which has a population of about 5.5m, the magazine reports
