![](https://www.tunnelsandtunnelling.com/wp-content/uploads/sites/3/2024/05/BTS-362x241.jpeg)
Corcoran, who was previously vice-chair, was elected at a committee meeting prior to the AGM yesterday. He takes over the role from Rod Young of Barhale.
Alastair Smith of Jacobs is the new vice-chair.
Serving the tunnelling industry since 1969.
John Corcoran of Morgan Sindall has been elected as the new chair of the BTS.
Corcoran, who was previously vice-chair, was elected at a committee meeting prior to the AGM yesterday. He takes over the role from Rod Young of Barhale.
Alastair Smith of Jacobs is the new vice-chair.